Name of person/persons who drafted Action Plan and will be lead for project.
Lead Director/Senior Manager responsible for the project (not necessarily the Director/Manager of the Project Lead).
Include the background of the issue and a brief description of issue or problem as it appears initially in "current state" terms. Include how the issue was identified, how long it has been in existence, and what has triggered the issue analysis at this time. Indicate why the issue should be considered a priority.
Background
Current State
Priority of Issue
Name of goal and key activity as per Strategic Framework, or project area.
Identify coding if relevant to specific program activity or internal order number.
How does this issue impact on the operations, policies, etc. of other Bureaux/Centres/Offices, or of other Directorates, Departments, or areas of Government?
Project Team and Time Required (indicate name, responsibility, and estimated time required per responsibility; these are proposed members)
Project Manager:
Project Leader:
Policy Analyst:
Regulatory Officer:
Support:
FTE: (e.g. 0.1 FTE (10% of 1 FTE) x 10 working group members x 3 months)
Contracts:
Consultation:
Printing costs, miscellaneous:
Translation:
Working Group Members (indicate targeted areas from which participation is requested)
Documentation
Where will documents be filed (paper and electronically)?
Workplan Phases (general description of how project will proceed)
Use steps in SOP #1 (Issue Analysis in TPD/BGTD) and SOP #2 (Guidance Development in TPD/BGTD) as guide.
Proposed Workplan
For every phase identified under Workplan Phases section above, include a proposed list of steps sorted by proposed target date and lead for each step. Include the proposed schedule for updates to management and management approvals, the internal and external consultations to be conducted, how and when other Directorates or other regulatory agencies will be involved, anticipated communications pieces, etc.
| Action | Target Date | By Whom | Status |
|---|---|---|---|
| Phase # | |||
| Identify the specific steps to be completed | Identify the proposed completion date | Identify the proposed lead | This will be updated as steps are completed |
| e.g. Form Working Group | |||
| e.g. Draft IAS | |||
| e.g. Consult internally | |||
| e.g. Consult externally | |||
| e.g. Present to DMC for approval | |||
| e.g. Conduct international scan | |||
| e.g. Draft guidance document | |||
| Responsible Authority(ies) | Date Approved |
|---|---|
| e.g. Lead Director/Senior Manager | |
| e.g. Directorate Management Committee |